We have supplied our GGBS and cement for a wide range of infrastructure projects
- Ongoing Projects
- Completed Projects
Used in a wide range of infrastructure projects including the construction of highways

Elevated Eastern Freeway Extension
The Mumbai Metropolitan Region Development Authority (MMRDA) has awarded work to Navayuga Engineering for the 13km long Eastern Freeway Extension project. This is a major infrastructure upgrade aimed at easing traffic congestion between Mumbai and Thane. As part of this expansion, an elevated corridor is being constructed between Chheda Nagar in Ghatkopar and Anand Nagar in Thane. Spanning 12.955 kilometers, the elevated flyover will rise directly above the existing Eastern Express Highway, with three lanes in each direction. The signal-free commute from Mumbai to Thane will help cutting travel time to just 30–35 minutes. It will connect directly with the existing Eastern Freeway, ensuring an uninterrupted journey for vehicles traveling from South Mumbai to Thane. They have lifted around 2995 MT GGBS till date.

Thane Coastal Road
Navayuga Engineering Company Ltd. (NECL) is constructing 13.45 km Thane Coastal Road. This 6 lane expressway by Mumbai Metropolitan Region Development Authority (MMRDA) will connect Kharegaon Toll Naka on Mumbai – Nashik Highway (NH-160 / old NH-3) with Gaimukh on Ghodbunder Road (MH SH 42). The 40m wide road will comprise of a 120m long creek bridge and a 6-lane 8.11 km elevated viaduct. Thane Coastal Road project aims to provide an alternate bypass road to Ghodbunder Road and divert traffic – especially commercial (goods) traffic – from entering Thane city. They have lifted around 1786 MT GGBS till date.

Bandra Kurla Complex (BKC) high-speed rail station in Mumbai
The terminal underground station for the Mumbai-Ahmedabad High-Speed Rail (MAHSR) corridor. Built about 24 meters below ground, it will serve as the only underground station on the corridor, feature six platforms, and be integrated with the Mumbai Metro and other transport modes. The construction is being undertaken by a joint venture between Megha Engineering and Infrastructures Limited (MEIL) and Hindustan Construction Company Limited (HCC), with a completion deadline of March 2028. The project will require around 700,000 cubic meters of concrete, utilizing grades ranging from M20 to M80. They have lifted around 13,000 MT of GGBS till date.

Elevated western cross-field taxiway at Kempegowda International Airport (KIA), Bangalore
The BIAL project involves the construction of a new elevated taxiway that will connect the existing north and south runways, spanning approximately 1.4 km. Scheduled for completion in three years, the project will require around 200,000 cubic meters of concrete, utilizing grades ranging from M15 to M60. The project is just started and they have lifted around 650 MT of GGBS till date.