After framing
Rough framing has laid out doors, walls, stairs and the like.
It can look complicated. Here are the basics of a complete, well-planned installation.
Rough framing has laid out doors, walls, stairs and the like.
Siding and roofing can go on while plumbing and wiring go in.
Follow the codes, plan each run and pass every inspection.
Codes are rules set by a country, state or city. They aim to make water use more efficient, and your plumber must follow them.
Codes matter most for
Not sure what the codes say? Hire a plumber who knows them and can apply them.
This is when pipes and wires first go into the frame.
Plumbing and electrical contractors start running lines through inner walls, roofs and floors.
Drain pipes and vents are fixed, with a water supply line to each connection.
Bathtubs and shower stalls go in now.
First piping for the heating, ventilation and air conditioning system and the furnace. HVAC vent pipes run up through the roof.
Goes into the floors, ceilings and walls.
A few choices make a bathroom comfortable and long-lasting.
Countertop materials · hover or tap for more
A badly laid line from the city may still work, but don't risk it. Follow these five steps.
Find how high the pipe must sit so it doesn't run deeper than needed. It starts at the home's main drain and slopes down to the city connection, called the tap. Use a laser level, GPS or standard survey tools to see where the ground needs levelling.
Use the pipe's length and the two elevations. Slope is the vertical drop divided by the total length.
Keep the trench as narrow as you can, and know where the pipe ends. The bottom should follow the slope and be smooth and firm. Lay sand as bedding: it supports the pipe and is easier to fine-tune than soil.
Fit one section at a time, starting from the low end.
Cover the pipe with sand first to protect it and fill gaps. Then pack the soil back in layers.
Local code decides the material and size you must use.
Wiring is critical work. Mistakes made without the right knowledge can be dangerous.
As the roof nears completion, the electrician fits light and switch boxes. Wiring starts after HVAC pipes and ducts are in, since wires are easier to route around them.
Wires run from the circuit breaker board to every box, including cable TV, music system and phone lines.
Plan the job
Show where the breaker box sits and the path to each outlet.
Start with the longest run to waste less. Work from upstairs down to the basement. Leave about a foot of spare wire at each end.
Check behind the wall for cables and pipes first. Drill through the centre of each stud with a 1-inch bit.
Put it in the basement or a utility room so it is easy to reach later.
That may not be enough for a bigger home. The article's example says a 1,500 sq ft house needs at least two circuits.
Wiring, step by step
Set the roll near the breaker box and pull wire along the route in your diagram.
Take it to the nearest outlet or switch, or run it straight through the box.
Use wire strippers.
Connect the wires to each outlet, fixture or switch.
One circuit per set. Give each set of wiring its own circuit, matched to the current it carries and what the outlet is for.
Reach out to the JSW Cement team before you start.
Insulation stops heat moving in or out of the house. R-value measures how well it resists heat: the higher, the better.
Pre-cut batts or rolls. Cheap and easy to fit between framing in walls, attics and open spaces.
Made from recycled newspaper and growing in popularity. Fills cavities, and also comes as boards and mats.
Helps control indoor temperature. Seals gaps and stops air leaks, often in thin walls and garage doors.
Damp can do serious damage, and untreated water becomes a big problem fast.
Waterproofing can be done inside or outside. Outside methods are best during construction.
Rain and leaking water tanks can ruin flooring and seep through the slab below. Finish the structure and fit rainwater pipes and electrical conduits before you waterproof.
Water pipes run under the floor, so waterproofing is a must to stop seepage into floors and walls.
Materials used
Local authorities do the final checks to confirm the building codes are met.
After curing, the inspector checks the foundation parts meet code and are fitted correctly.
Covers rough framing, plumbing, and electrical and mechanical systems. It is often split into three separate checks, with framing done apart from electrical and mechanical.
Once inspection passes, drywall (also called plasterboard, wallboard or gypsum board) is delivered to site.
Next up: the tools and tape for drywall, the step that replaces traditional plaster. Explore JSW Cement